This week is week 12 and its study week meaning we don't have to go to school but study at home. Even though we don't have classes we can't fall behind on our assignments, we still have to stay on track because this is less than 3 weeks before the date, we are due to submit our assignments. Last week we went to the fabric store and finished collecting all the fabrics for our costume design.
Because my initial dress design is in the colors of the rainbow, that is, it has purple included in it. However, purple is not our theme color, so I had to change it to another theme color. I ended up swapping purple for red and pink. After we decided on the design style, we put all 6 designs on the finalization board. As a result, this week we completed the sketching board and the Design Innovation Board with the colors of the 6 looks that were finalized. I am very happy and grateful to my teammates, I am happy with the progress of this assignment, and I am glad to have them as a motivated team.
Comments
Post a Comment